Site visit-Did walk through Get link Facebook X Pinterest Email Other Apps July 03, 2017 Contractor was doing the finishing items when i arrived, i looked over site and it looked good. Contractor had pour concrete in the rip rap at this corner to help hold rip rap. finishing hanging fence. Get link Facebook X Pinterest Email Other Apps Comments
Site visit-Poured concrete to fill in approach June 29, 2017 12:22pm- Contractor built a form on the Northeast side of bridge and poured concrete 1:07pm- Made several holes on the South end of bridge and filled the void with MODOT class b concrete. Read more
Comments
Post a Comment