Posts

Showing posts from June, 2017

Site visit-Poured concrete to fill in approach

Image
12:22pm- Contractor built a form on the Northeast side of  bridge and poured concrete  1:07pm- Made several holes on the South end of bridge and filled the void with MODOT class b concrete.